Working Bees

A good turn up for Septic Installation 25.5.07

Septic Tank set and seepage drain 25.5.07

Erecting the Shed Col Belfield, Adrian Bond & Robin Widdowson 5.7.08

Ingomar finishing off concrete block for Water Pump 5.7.08

Peter Campbell let there be water 22.11.08.

Pres Adrian Bond Cable trenching for BBQ Light 4.6.11

Trenching for Water Pipe from River to Water tank 25.5.07

New Big gate 19.8.07

Concrete gang Rick Emonson &  Adrian Bond. Mixing concrete for shed floor 5.7.08.

Brian Denner & Adrian Bond setting up the water system 22.11.08

Adrian Boring Hole for light pole, Mick Rosenboom & Ron Healey looking on 4.6.11

Standing Mick's Mercury Vapour light pole over BBQ and running power cable.

Digging hole for Septic Tank 25.5.07

And a front gate too. Farmer Bond doing the fitting.

Luigi Matthes laying shed floor 5.7.08.

Ron Healey setting the post for the back water tap 22.11.08

Adrian, Ron & Trevor Stow Mixing concrete to set pole.

Ingomar Matthes & Trevor Stow fitting New blinds 4.6.11.

Acknowledgement

The Club acknowledges Sport and Recreation Victoria through the COUNTRY ACTION GRANT SCHEME for the funding to originally set up this website in 2013. In 2024 with the assistance through the Victorian Government STRONGER FISHING CLUBS GRANT SCHEME the Club was provided with funds to completely update the site with the latest software and security systems.

Member's login